半岛娱乐投注体育
半岛体育
It is suitable for planting waterproof projects such as roof garden, planting roof, planting roof, municipal greening and so on.
半岛娱乐投注体育老虎机
Model | Thickness(mm) | Wide(m) | Length(m) | Lap edges | Execution standards |
半岛娱乐投注体育 | 1.2、1.5 | 2.0 | 20 | Weld | GB27789-2011 |
半岛体育注册网站 | GB/T35468-2017 |
Product features
1. It has excellent root puncture resistance, can avoid plant roots penetrating the waterproof layer, and can be used in complex underground environments;
2. It has excellent welding performance, which can greatly improve the root resistance, waterproofing and sealing stability of the lap joint;
3. No heavy metals or other harmful components to plant roots, recyclable, good environmental performance;
4. Resistant to mold and algae and other microorganisms;
5. Resistant to acid, alkali, salt and lubricating oil corrosion;
6. Reduce the urban heat island effect, increase comfort space, and improve rainwater management.
半岛体育app下载中心
半岛娱乐投注体育
project | index | |||
---|---|---|---|---|
H | L | P | ||
The thickness of the resin layer on the intermediate tire base/mm ≥ | - | - | 0.4 | |
Tensile properties | Maximum tensile force/ (N/cm) ≥ | - | 200 | 250 |
Tensile strength/MPa ≥ | 12.0 | - | - | |
Elongation at maximum tensile force/% ≥ | - | - | 15 | |
Elongation at break/% ≥ | 500 | 250 | - | |
Low temperature bending | -40°C without cracks | |||
Seam peel strength/ (N/mm) ≥ | 4.0 or coil destruction | 3.0 | ||
Right angle tear strength/ (N/mm) ≥ | 60 | - | - |
半岛娱乐投注体育网页版
project | index | |||
Resistant to mold and corrosion | Anti-mildew grade | Level 0 or 1 | ||
Seam peel strength | No processing(/ N/mm) | Plastic waterproofing membrane | weld | ≥ 3.0 or coil damage |
Bond | ≥1.5 | |||
Retention rate after heat aging treatment/% | ≥80 or coil destruction |
Construction steps
Full adhesion method: base layer cleaning → pre-laid coil → large surface gluing → laying coil → lap treatment → node strengthening → closing treatment → self-inspection and receipt
Empty paving method: base layer cleaning → pre-laid coil → lap treatment → node reinforcement → self-inspection and acceptance
Case show
Xinxiang City Activity Staff Center