半岛体育注册开户

半岛娱乐投注体育

Underground engineering floor and side wall of the basement with small construction space, mining method tunnel.

半岛娱乐投注体育体育真人

Model Thickness(mm) Wide(m)

Length(m)

Category P (plastic) 1.2、1.5、1.7 1 20

 

Product features

1. Using pre-paving anti-adhesive method construction, the waterproof membrane and concrete structure form an excellent full adhesion effect, waterproof and reliable without channeling water.

2. Based on HDPE sheet, the coil has excellent physical properties, high strength and good puncture resistance.

3. Butyl self-adhesive layer has excellent aging resistance and water resistance, and can be used in complex underground environments.

半岛体育最新网址

Executive standard: GB/T23457-2017 "Pre-paved waterproofing membrane"

Project Indicators (P category)
Tensile properties pulling force/(N/50mm)≥ 600
Tensile strength/MPa≥ 16
Membrane rupture elongation/%≥ 400
Phenomenon when stretching There is no separation between the adhesive layer and the main material
Nail rod tear strength/N≥ 400
Puncture resistance/N≥ 350
Impact resistance(0.5kg·m) No leakage
Resistant to static loads 20kg, no leakage
Heat tolerance 80 °C, 2h no slip, flow, dripping
Low temperature bending The main material is -35 °C, no cracks
Low temperature flexibility Adhesive layer -25 °C, no cracks
Oil permeability/number of sheets≤ 1
Resistance to channeling (hydraulic gradient) 0.8MPa/35mm, 4h no channeling
Impermeable(0.3MPa,120min) Impermeable
With post-poured concrete
Peel strength/(N/mm)
No processing≥ 1.5
Water immersion treatment≥ 1.0
Sediment contaminates the surface≥ 1.0
UV treatment≥ 1.0
Heat treatment≥ 1.0
Peel strength after water immersion with post-poured concrete/(N/mm)≥ 1.0
Coil to coil peel strength
(lap edge)/(N/mm)
No processing≥ 0.8
Water immersion treatment≥ 0.8
The anti-stick treatment part of the coil has strong peeling/(N/mm)≤ Non-adhesive
Heat aging
(80℃,168h)
Pull retention/%≥ 90
Elongation retention/%≥ 80
Low temperature bending The main material is -32 °C, no cracks
Low temperature flexibility Adhesive layer -23 °C, no cracks
Rate of dimensional change/%≤ ±1.5

 

Construction steps

Base layer cleaning → Bullet line positioning → Large surface paving waterproofing membrane → Lap treatment → Detailed node sealing → Self-inspection, repair, acceptance → Lashing steel bars